Develop and implement commissioning plans and procedures for battery energy storage systems (BESS).
Coordinate with project managers, engineers, and contractors to ensure alignment and timely completion of tasks.
Oversee the installation of battery storage systems, ensuring compliance with design specifications and safety standards.
Conduct pre-commissioning checks and inspections to verify system integrity and readiness.
Develop and execute system sequence of operations to enable energy system use cases such as demand response, on and off-grid reliability, renewable energy optimization, frequency regulation, energy arbitrage, distributed energy resource optimization, etc.
Perform initial power-up and configuration of BESS.
Conduct functional and performance tests to verify system operation according to design parameters.
Troubleshoot and resolve any issues that arise during the commissioning process.
Define system test plans and reliability requirements.
Maintain accurate records of commissioning activities, test results, and system performance data.
Prepare and submit detailed commissioning reports, including any deviations from design specifications and corrective actions taken.
Provide training and support to operations and maintenance personnel on the proper use and maintenance of the BESS.
Develop and deliver training materials and user manuals.
Identify and recommend improvements to commissioning processes and procedures.
Stay updated with industry developments and advancements in battery storage technology.
Translates technical information to varied audiences through written communication and presentation skills.
Requirements
Bachelor of Science Degree in Electrical Engineering, or related discipline
5+ years of relevant work experience in battery energy storage deployment
Hands on involvement with troubleshooting, testing, validating, and commissioning AC/DC electrical systems
Background with battery energy storage systems, microgrids, distributed energy resources, power conversion systems, low or medium voltage electrical distribution
Commissioning experience with C&I BESS applications
Maintain expert level of internal product knowledge on energy storage system and controls philosophy
Ability to apply product knowledge and technical skills to solve problems independently with minimum supervision
Benefits
Health, Dental, Vision
401k
Volunteer Time Off program
Applicant Tracking System Keywords
Tip: use these terms in your resume and cover letter to boost ATS matches.
Hard skills
battery energy storage systemscommissioning planssystem sequence of operationsAC/DC electrical systemstroubleshootingtestingvalidatingperformance testspower conversion systemslow or medium voltage electrical distribution
Soft skills
communication skillspresentation skillsproblem-solvingtraining and supportcollaborationattention to detailorganizational skillsadaptabilityindependent workprocess improvement
Certifications
Bachelor of Science Degree in Electrical Engineering