
Construction Schedule Analyst
Doxel
full-time
Posted on:
Location Type: Remote
Location: India
Visit company websiteExplore more
About the role
- Analyze customer’s project schedules to classify activities for internal tracking operations as well as critical path and float for inclusion in system reporting
- Create detailed zone plans to match schedule organization and coordinate with the VDC team for zone creation
- Perform product data analysis, analyzing and verifying data generated for customer reports from scan data compared to a 3D model using proprietary techniques developed by the Doxel
- Maintain ongoing communication throughout the workday using Slack as the primary messaging platform along with Jira tickets
- Conduct direct phone calls and conference calls over Zoom
Requirements
- 2+ years experience in construction scheduling, project engineering, project controls, or field coordination
- Bachelor degree or greater in Construction Management, Mechanical or Electrical Engineering, or related field; or equivalent field experience
- Experience working on data center, hospital, complex manufacturing, biopharmaceutical, or similar projects
- Experience with Primavera P6 scheduling software
- Strong written and verbal communication skills
- Ablity to work independently, prioritize, and drive closure on open items
- Must be fluent in English
- 3+ years of experience in the construction industry creating and managing project budgets (Preferred)
- 3+ years of experience in project management in the construction industry (Preferred)
- Experience with Synchro scheduling software (Preferred)
- Experience with construction project estimating and cost management (Preferred)
- Bachelor’s degree in Computer Science or equivalent work experience (Preferred)
Benefits
- Competitive Base Salary + Equity Package
- Remote first culture (for most roles)
- Comprehensive Health Insurance (Medical, Dental, Vision)
- Home Office Stipend
- Monthly allowance for cell phone and internet
- Flexible PTO, generous company holiday policy, and unlimited sick days
Applicant Tracking System Keywords
Tip: use these terms in your resume and cover letter to boost ATS matches.
Hard Skills & Tools
construction schedulingproject engineeringproject controlsfield coordinationdata analysisPrimavera P6Synchro schedulingproject estimatingcost management
Soft Skills
strong written communicationstrong verbal communicationindependent workprioritizationdriving closure