Turner & Townsend

Senior Utility Infrastructure Manager – Data Center Construction

Turner & Townsend

full-time

Posted on:

Location Type: Remote

Location: VirginiaUnited States

Visit company website

Explore more

AI Apply
Apply

Job Level

Tech Stack

About the role

  • Support delivery of high‑voltage substation and transmission‑level infrastructure required for large‑scale data center developments.
  • Coordinate closely with utility providers on power delivery schedules, grid connections, and long‑lead equipment.
  • Oversee construction interfaces related to high‑capacity electrical systems and transmission upgrades.
  • Manage installation of major power systems, modular infrastructure components, and backup generation.
  • Coordinate multi‑phase construction activities across large campuses with significant utility, water, and sewer improvements.
  • Monitor fast‑track construction activities tied to power delivery, site utilities, and building infrastructure.
  • Collaborate with design teams, contractors, and utility partners across all delivery phases.
  • Support schedule development, risk identification, reporting, and interface management for utility‑related scopes.
  • Ensure compliance with permitting, environmental requirements, and local authority processes.
  • Provide on‑site oversight for utility and infrastructure construction activities.
  • Drive safety leadership and ensure adherence to all health and safety standards.
  • Support resolution of technical challenges and ensure quality across all project stages.

Requirements

  • Experience managing large utility, electrical, industrial, or mission‑critical infrastructure projects.
  • Strong understanding of high‑voltage substation construction, transmission systems, and large‑capacity power delivery.
  • Bachelor’s or advanced degree in engineering, construction management, or a related field required.
  • Additional training or certifications (e.g., PMP, PE) preferred.
  • Ability to manage complex stakeholder groups including contractors, utility providers, and multidisciplinary teams.
  • Excellent communication, coordination, and problem‑solving skills.
Benefits
  • Health insurance
  • Flexible working environment
  • Professional development opportunities
  • Paid time off
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills & Tools
high-voltage substation constructiontransmission systemslarge-capacity power deliveryutility infrastructure managementconstruction managementrisk identificationquality assurancesafety leadershiptechnical problem-solving
Soft Skills
communicationcoordinationproblem-solvingstakeholder managementteam collaboration
Certifications
PMPPE