Apply

Ready to go for it?

AI Apply speeds things up—apply directly if you prefer.

FREE ACCESS
5,000–10,000 jobs/day
JobTailor Logo

See all jobs on JobTailor

Search thousands of fresh jobs every day.

Discover
  • Fresh listings
  • Fast filters
  • No subscription required
Create a free account and start exploring right away.
Turner & Townsend

Preconstruction Planner – EV Construction

Turner & Townsend

Preconstruction Planner creating site feasibility studies and conceptual layouts for EV operations facilities. Turner & Townsend delivers global professional, project, and cost management services.

Posted 8/4/2026full-timeRemote • California • 🇺🇸 United StatesMid-LevelSenior💰 $110,000 - $130,000 per yearWebsite

Core Competencies

Role fit
Core Competencies

Use this summary to align your resume positioning with the role.

Demonstrates expertise in architectural planning and early-phase design, with a strong focus on EV charging infrastructure and compliance with accessibility standards. Proficient in producing detailed drawings and collaborating effectively with cross-functional teams to meet operational needs.

Highest-signal resume keywords
Bachelor’s Degree In Architecture3–5 Years Of Experience In Architectural PlanningProficiency In AutoCADExperience Designing EV Charging InfrastructureStrong Communication And Collaboration Abilities

ATS Keywords

Tailor your resume
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills
Architectural PlanningEarly-Phase DesignFeasibility StudiesZoning AnalysisBuilding Code Principles
Soft Skills
Excellent Organizational SkillsCreative Problem-SolvingStrategic ThinkingAbility To Manage Multiple ProjectsAdaptability To Shifting Priorities
Tools & Technologies
AutoCADBluebeamGoogle Apps
Industry Keywords
EV Operations FacilitiesSite Feasibility PlansAccessibility StandardsElectrical RequirementsSOX Control Responsibilities

About the role

Key responsibilities & impact
  • Develop early-phase spatial planning and site feasibility plans for EV operations facilities
  • Create site layouts, feasibility studies, and early-stage design concepts for new and existing EV operations facilities
  • Produce detailed drawings and documentation for service areas, support spaces, and site infrastructure
  • Design and coordinate EV charging layouts in compliance with accessibility standards and electrical requirements
  • Collaborate with Preconstruction and Design management teams to align designs with operational needs
  • Participate in site evaluation and provide architectural input during due diligence and planning
  • Adhere to applicable SOX control responsibilities

Requirements

What you’ll need
  • Bachelor’s degree in Architecture, Architectural Engineering, or a related field
  • 3–5 years of experience in architectural planning or early-phase design
  • Experience supporting entitlement or feasibility studies preferred
  • Experience designing EV charging infrastructure and coordinating with electrical systems is a plus
  • Proficiency in AutoCAD
  • Basic knowledge of Bluebeam
  • Proficiency in Google apps and interface preferred
  • Basic knowledge of zoning analysis and building code principles
  • Excellent organizational skills
  • Ability to work efficiently under short pursuit timelines
  • Strong communication and collaboration abilities across diverse teams
  • Creative problem-solving and strategic thinking
  • Ability to manage multiple concurrent projects and adapt to shifting priorities

Benefits

Comp & perks
  • Remote work option
  • Bonuses may be available
  • Comprehensive benefits package
  • Flexible working environment
  • Work-life balance support
  • Equal opportunity and inclusive environment