Apply

Ready to go for it?

AI Apply speeds things up—apply directly if you prefer.

FREE ACCESS
5,000–10,000 jobs/day
JobTailor Logo

See all jobs on JobTailor

Search thousands of fresh jobs every day.

Discover
  • Fresh listings
  • Fast filters
  • No subscription required
Create a free account and start exploring right away.
Turner & Townsend

Senior Electrical Estimator – Data Center Construction

Turner & Townsend

Senior Electrical Estimator managing electrical cost estimates for large-scale data center projects. Collaborating with engineering and procurement teams in a fast-paced construction environment.

Posted 7/24/2026full-timeRemote • California • 🇺🇸 United StatesSenior💰 $130,000 - $170,000 per yearWebsite

Core Competencies

Role fit
Core Competencies

Use this summary to align your resume positioning with the role.

Demonstrates expertise in electrical estimating for large-scale data center projects, including proficiency in power distribution systems and advanced estimating tools. Capable of leading teams, managing risks, and ensuring compliance with electrical codes and safety standards.

Highest-signal resume keywords
Electrical EstimatingPower Distribution SystemsBIM InterpretationEstimating Tools ProficiencyLeadership in Multidisciplinary Environments

ATS Keywords

Tailor your resume
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills
Electrical Cost EstimationElectrical Quantity TakeoffsLabor Pricing ModelsValue EngineeringRisk ManagementHigh-Density Electrical SystemsHyperscale Infrastructure EstimatingElectrical Codes ComplianceCost AnalysisChange Management
Soft Skills
Analytical SkillsCommunication SkillsMentorship
Tools & Technologies
AccubidConEstMcCormickBluebeam
Industry Keywords
Data Center ProjectsMission-Critical InfrastructureUtility Tie-InsSubstationsCampus-Wide Electrical Distribution

About the role

Key responsibilities & impact
  • Lead the preparation of detailed electrical cost estimates for hyperscale data center projects, including medium‑ and low‑voltage distribution, substations, UPS systems, generators, switchgear, busway, grounding, and lighting systems.
  • Perform and oversee comprehensive electrical quantity takeoffs from drawings, specifications, and BIM models, including conduit, cabling, transformers, generators, and associated infrastructure.
  • Develop, validate, and challenge labor, material, and equipment pricing models aligned with project budgets, delivery strategies, and evolving market conditions.
  • Establish and maintain historical cost data, benchmarks, and estimating standards to support large‑scale programs and future project forecasting.
  • Review, analyze, and normalize electrical contractor and subcontractor bids, identifying scope gaps, cost risks, and commercial exposure.
  • Lead and support value engineering and design optioneering efforts, evaluating alternative electrical systems, layouts, and installation methods while maintaining redundancy and reliability requirements.
  • Partner closely with engineering, procurement, and construction leaders to inform electrical system decisions based on cost, constructability, schedule, and risk.
  • Identify and proactively manage risks related to long‑lead electrical equipment, supply chain constraints, labor availability, and market escalation.
  • Account for regional cost variability across U.S. markets, including labor rates, logistics constraints, permitting considerations, and utility interface requirements.
  • Support estimating for large‑scale power infrastructure, including utility tie‑ins, substations, and campus‑wide electrical distribution.
  • Contribute to standardized data center designs and repeatable delivery models, improving cost certainty, scalability, and speed to market.
  • Ensure electrical estimates align with applicable codes, safety standards, sustainability objectives, and energy efficiency requirements.
  • Prepare clear, defensible estimating deliverables and present findings to internal teams and external stakeholders.
  • Participate in cost reviews, procurement discussions, funding approvals, and commercial strategy sessions.
  • Support change management by assessing electrical scope changes and cost impacts throughout the design and construction lifecycle.
  • Provide estimating handover materials to construction teams to support alignment between estimate and execution.
  • Offer mentorship and technical guidance to junior estimators and contribute to estimating best practices.

Requirements

What you’ll need
  • Bachelor’s degree in Electrical Engineering, Construction Management, or a related discipline, or equivalent professional experience.
  • 7+ years of experience in electrical estimating, with strong preference for data center, mission‑critical, or large‑scale infrastructure projects.
  • Advanced technical knowledge of power distribution systems, backup generation, UPS systems, electrical codes, and labor productivity.
  • Demonstrated experience estimating high‑density and hyperscale electrical systems is highly desirable.
  • Proficiency in estimating and takeoff tools such as Accubid, ConEst, McCormick, Bluebeam, or similar platforms, with strong familiarity interpreting BIM‑based information.
  • Strong analytical and communication skills, with the ability to clearly articulate cost drivers, assumptions, and risks.
  • Proven ability to operate independently while providing leadership within a collaborative, multidisciplinary project environment.

Benefits

Comp & perks
  • Health insurance
  • Retirement plans
  • Paid time off
  • Flexible work arrangements
  • Professional development opportunities