Apply

Ready to go for it?

AI Apply speeds things up—apply directly if you prefer.

FREE ACCESS
5,000–10,000 jobs/day
JobTailor Logo

See all jobs on JobTailor

Search thousands of fresh jobs every day.

Discover
  • Fresh listings
  • Fast filters
  • No subscription required
Create a free account and start exploring right away.
Turner & Townsend

Mechanical Design Director – Data Center Construction

Turner & Townsend

Mechanical Design Director leading MEP design and engineering for data center construction projects. Responsibilities include project management, client interaction, and technical guidance in mechanical and electrical systems.

Posted 6/3/2026full-timeRemote • Colorado • 🇺🇸 United StatesLeadWebsite

ATS Keywords

Tailor your resume
Applicant Tracking System Keywords

Tip: use these terms in your resume and cover letter to boost ATS matches.

Hard Skills
MEP designelectrical systemsmechanical systemsengineering leadershipproject managementenergy efficiencycost-effectivenesstechnical guidancedesign standardsprototype design
Soft Skills
communicationpresentation skillscollaborationstrategic leadershipproblem-solvingclient-facingteam playerorganizational skillsinnovative thinkinginterpersonal skills
Tools & Technologies
AutoCADRevitBluebeamMS Office Suiteproject management softwarevendor submittal reviewsfactory witness testingOFCI equipmentdesign documentationconstruction management
Certifications & Qualifications
College Degree in EngineeringConstruction Management
Industry Keywords
large-scale constructiondata centremission-critical facilitiesconcurrently maintainable systemsMEP contract documentsdesign RFPsengineering policiesbest practicesproject outcomesclient services

About the role

Key responsibilities & impact
  • Provides support and reports to the assigned Project Manager(s) or Project Director.
  • This position has frequent interaction with the Owner/Client, consultants, design professionals, and contractors.
  • Directly assist the Project Manager(s) in managing, coordinating, and administering the project through all phases of design and construction, with an emphasis on electrical and mechanical system design leadership.
  • Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client’s needs are addressed, including technical guidance on concurrently maintainable electrical power and mechanical systems.
  • Aids in the preparation of documents (reports, schedules, invoices, RFI’s, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout, and client presentations) for programming, design, and construction, and will assist in maintaining information in project management software.
  • Coordinate to schedule meetings with the project team as directed by the Project Manager(s).
  • Communicate conceptual designs and create/maintain project documentation before, during, and after construction, including MEP design standards, basis of design updates, and OFCI equipment specifications.
  • Maintenance of Basis of Design, prototype design, and template specifications for electrical and mechanical systems, ensuring alignment with evolving business and operational requirements.
  • Review and inform design RFPs, including scope development for MEP engineering services.
  • Manage external design consultants through the design and construction process, ensuring MEP contract documents are completed on schedule, within budget, and in accordance with company standards.
  • Effectively communicate design standards to internal and external project partners, including engineering and operations teams.
  • Manage multiple fast-paced projects simultaneously, providing strategic technical leadership across electrical and mechanical design activities.
  • Think outside of the box to find innovative solutions prior to and during the construction process to reduce costs without negative impacts on quality, reliability, or energy efficiency.
  • Support procurement through vendor submittal reviews, factory witness testing, and evaluation of OFCI equipment.
  • Identify and implement innovative technologies to enhance energy efficiency, system resilience, and cost-effectiveness.
  • Stay current with industry advancements and apply best practices to strengthen functional operations and project outcomes.
  • Communicate and enforce engineering and design policies across the organization.

Requirements

What you’ll need
  • College Degree in Engineering (Mechanical, Electrical), Architecture, Construction Management, or related field.
  • Experience working in Project Management on large-scale construction programs, including data centre or mission-critical facilities.
  • Experienced in MEP design, electrical and mechanical systems, and engineering leadership.
  • Solid working proficiency with AutoCAD, Revit, Bluebeam, and MS Office Suite.
  • Experience overseeing the preparation and approval of MEP contract documents produced by third-party design consultants.
  • Strong understanding of concurrently maintainable electrical power systems, mechanical cooling systems, and OFCI equipment specifications.
  • Excellent presentation skills and the ability to be highly effective in a client-facing role.
  • Team player; ability to work collaboratively across engineering, operations, procurement, and project management teams.

Benefits

Comp & perks
  • Health insurance
  • 401(k) matching
  • Flexible work hours
  • Paid time off
  • Professional development opportunities